Emission Factor

Aluminium mullion-transom system with triple glazing

121.1kgCO2e/m2

Interested in licensing this data?

Request a quote

Emission factor summary

Emission intensity of aluminium mullion-transom system with triple glazing. The lifecycle assessment for modules A1-A3 includes: the extraction and processing of raw materials (A1) their transportation to the manufacturer (A2) and the actual manufacturing of the product (A3). Retrieved from the CSV file OEKOBAUDAT 2023-I in the source URL.

PropertyValue
NameAluminium mullion-transom system with triple glazing
SectorMaterials and Manufacturing
CategoryBuilding Materials
SourceOEKOBAUDAT
Source DatasetOEKOBAUDAT 2023-I
Region
Unit Type
Year
2018
Year Released
2023
Emission Factor
  • CO2e121.1kg/m2
LCA Activity
cradle_to_gate
CO2e Calculation Origin
Source
CO2e Calculation Method
AR4
Supported CO2e Calculation Method
AR4
Data Versioning
  • Status: Current

API Reference

Activity ID
building_materials-type_aluminium_mullion_transom_system_with_triple_glazing
UUID
e1bf9bf0-3e49-4179-89f9-5c359207f8c0
Code Snippet
View API Docs

Automate emission calculations with Climatiq

Related factors

OEKOBAUDAT Emission Factors

Explore All

Building Materials Emission Factors

Explore All
  • Go to Cement production

    Cement production

    Materials and Manufacturing Materials and Manufacturing
    135 Factors135 Factor
  • Go to Cement

    Cement

    Materials and Manufacturing Materials and Manufacturing
    82 Factors82 Factor
  • Go to Concrete products

    Concrete products

    Materials and Manufacturing Materials and Manufacturing
    78 Factors78 Factor