Climatiq
Emission Factor

Wind turbine network connection - 2mw - onshore (wind turbine network connection construction - 2MW - onshore)

123.45

Interested in licensing this data?

Emission factor summary

Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of a wind turbine network connection 2MW onshore. The infrastructure represents a network connection for wind turbines with 2MW using a 10 kV-cables with a total length of 1 000 m per turbine. It has a lifetime of 20 years. The process includes all main materials for the construcion their decommission and land use but it excludes energy use for assembly. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.

PropertyValue
NameWind turbine network connection - 2mw - onshore (wind turbine network connection construction - 2MW - onshore)
SectorBuildings and Infrastructure
CategoryConstruction
Sourceecoinvent
Source DatasetCut-off Cumulative LCIA v3.10
Region
Year
2008
Year Released
2023
Emission Factor
  • CO2e0000kg/number
Scopes
XX,XX
LCA Activity
unknown
Supported CO2e Calculation Method
xxx
Data Versioning
  • Status: Replaced
  • Replaced in: 22Version log
  • Replaced by: 2f19ac78-6839-4c0c-b0f7-49fb20da55a7

Detailed Metadata

UUID
xxxxxx-xxxx-xxxxxxxx-xxxx-xxxxxxxx
Unit Type
Unit Type

API Reference

Code Snippet
View API Docs

Automate emission calculations with Climatiq

Related factors

ecoinvent Emission Factors

Explore All

Construction Emission Factors

Explore All