Interested in licensing this data?
Request a quote→Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of uranium conversion facility. The facility does not differenciate between dry and wet process. Its lifetime is assumed to be 40 years with a yearly output of 5 000 tons. The process includes land use of the factory energy (electricity and diesel) and material requirements for the construction of the facility and decommission. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Uranium conversion facility (uranium conversion facility construction) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Source Dataset | Cut-off Cumulative LCIA v3.10 |
Region | |
Unit Type | |
Year | 1980 |
Year Released | 2023 |
Emission Factor | |
LCA Activity | unknown |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Activity ID
construction-type_uranium_conversion_facility_uranium_conversion_facility_construction
UUID
dad9bd29-a48b-4b67-8be1-3707a0e4622d
Code Snippet
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Silicon - electronics grade (market for)
Silicon - electronics grade (market for)
Materials and Manufacturing Materials and Manufacturing1 Factor1 Factor - Go to Industrial machine - heavy - unspecified (market for)
Industrial machine - heavy - unspecified (market for)
Equipment Equipment2 Factors2 Factor - Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor