Wooden board factory - cement bonded boards (wooden board factory construction)
Interested in licensing this data?
Request a quote→Emission factor summary
The activity generating the emissions is wooden board factory construction, cement bonded boards. The reference product is wooden board factory, cement bonded boards. This is an immobile infrastructure, representing the construction of a wooden board factory, cement bonded boards. The infrastructure represents a medium sized production plant for cement bonded wooden boards using one or several stack-presses. Its lifetime is assumed to be 50 years and its lifetime production volume is 2,500,000 m3 board. The process includes land area, building material needed for building and decommission of the plant. The reference product amount is 1. The cut-off classification is allocatable product. The activity type is ordinary ordinary transforming activity. Please refer to the ecoinvent documentation here for full details: https://ecoquery.ecoinvent.org/3.11/cutoff/dataset/7405/documentation.
| Property | Value |
|---|---|
| Name | Wooden board factory - cement bonded boards (wooden board factory construction) |
| Sector | Buildings and Infrastructure |
| Category | Construction |
| Source | ecoinvent |
| Source Dataset | Cut-off Cumulative LCIA v3.11 |
| Region | |
Unit Type | |
| Year | 2002 |
| Year Released | 2024 |
| Emission Factor |
|
| Scopes | 3.1, 3.2 |
LCA Activity | unknown |
Supported CO2e Calculation Method | AR5, AR6 |
| Data Versioning |
|
API Reference
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Silicon - electronics grade (market for)
Silicon - electronics grade (market for)
Materials and Manufacturing Materials and Manufacturing1 Factor1 Factor - Go to Industrial machine - heavy - unspecified (market for)
Industrial machine - heavy - unspecified (market for)
Equipment Equipment2 Factors2 Factor - Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Educational and vocational structures
Educational and vocational structures
Buildings and Infrastructure Buildings and Infrastructure151 Factors151 Factor - Go to Health care structures
Health care structures
Buildings and Infrastructure Buildings and Infrastructure151 Factors151 Factor