Emission Factor
Aluminium melting furnace (market for aluminium melting furnace)
Interested in licensing this data?
Request a quote→Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of aluminium melting furnace. The infrastructure is based on a medium sized casting plant with a yearly production of 10 000 tons and a life time of 50 years. Its construction includes production hall machinery and decommission. The cut-off classification is allocatable product. The activity type is market activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Aluminium melting furnace (market for aluminium melting furnace) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Source Dataset | Cut-off Cumulative LCIA v3.10 |
Region | |
Unit Type | |
Year | 2011 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | unknown |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Activity ID
construction-type_aluminium_melting_furnace_market_for_aluminium_melting_furnace
UUID
c6475a13-3a0e-46a4-b68c-0636bcc6139b
Code Snippet
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Highways / roads / streets / bridges and tunnels
Highways / roads / streets / bridges and tunnels
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor