Climatiq
Emission Factor

Nuclear waste storage - interim - for low level radioactive waste before final repository (nuclear waste storage construction - interim - for low level radioactive waste before final repository)

123.45

Interested in licensing this data?

Emission factor summary

Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of a nuclear waste storage interim for low level radioactive waste before final repository. The infrastructure has a capacity for approximately 20 000 m3 of conditioned waste. The interim nuclear waste storage uses an area of approximately 32'000 m2 industrial area. Half of this area (16'000 m2) is accounted for in this module and the other half is accounted for in the module "nuclear waste storage interim for high level radioactive waste before final repository". The construction time of the facility is 5 years and the operating time is 55 years. The process includes building materials energy consumption during construction and decommiddioning (electricity and diesel oil) land use and decommission from dismantling of the buildings. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.

PropertyValue
NameNuclear waste storage - interim - for low level radioactive waste before final repository (nuclear waste storage construction - interim - for low level radioactive waste before final repository)
SectorBuildings and Infrastructure
CategoryConstruction
Sourceecoinvent
Source DatasetCut-off Cumulative LCIA v3.10
Region
Year
1992
Year Released
2023
Emission Factor
  • CO2e0000kg/number
Scopes
XX,XX
LCA Activity
unknown
Supported CO2e Calculation Method
xxx
Data Versioning
  • Status: Replaced
  • Replaced in: 22Version log
  • Replaced by: 98a28c23-9ef6-4a67-8720-f22644343fde

Detailed Metadata

UUID
xxxxxx-xxxx-xxxxxxxx-xxxx-xxxxxxxx
Unit Type
Unit Type

API Reference

Code Snippet
View API Docs

Automate emission calculations with Climatiq

Related factors

ecoinvent Emission Factors

Explore All

Construction Emission Factors

Explore All