Nuclear waste storage - interim - for high level radioactive waste before final repository (nuclear waste storage construction - interim - for high level radioactive waste before final repository)
Interested in licensing this data?
Request a quote→Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of a nuclear waste storage interim for high level radioactive waste before final repository. The infrastructure has a capacity for approximately 20 000 m3 of conditioned waste. The interim nuclear waste storage uses an area of approximately 32'000 m2 industrial area. Half of this area (16'000 m2) is accounted for in this module and the other half is accounted for in the module "nuclear waste storage interim for low level radioactive waste before final repository". The construction time of the facility is 5 years and the operating time is 55 years. The process includes building materials energy consumption during construction and decommiddioning (electricity and diesel oil) land use and decommission from dismantling of the buildings. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Nuclear waste storage - interim - for high level radioactive waste before final repository (nuclear waste storage construction - interim - for high level radioactive waste before final repository) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Source Dataset | Cut-off Cumulative LCIA v3.10 |
Region | |
Unit Type | |
Year | 1992 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | unknown |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Highways / roads / streets / bridges and tunnels
Highways / roads / streets / bridges and tunnels
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor