Emission Factor
Deep well - drilled - for geothermal power (deep well drilling - for deep geothermal power)
Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the drilling of 1 meter of a borehole for deep geothermal power generation. The infrastructure represent a well with a depth of 5 000m an onshore drilling with a rig capacity of 6.75 MWel and a borehole with a diameter at the top is 10 inches. The process excludes waster treatment. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Deep well - drilled - for geothermal power (deep well drilling - for deep geothermal power) |
Sector | Buildings and Infrastructure |
Category | Infrastructure |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 2015 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR5, AR6 |
API Reference
Activity ID
infrastructure-type_deep_well_drilled_for_geothermal_power_deep_well_drilling_for_deep_geothermal_power
UUID
97c34474-2915-4882-84c9-cd6d4c82fd8d
Code Snippet
Automate emission calculations with Climatiq
Get started →Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Infrastructure Emission Factors
Explore All- Go to Pipeline transport
Pipeline transport
Buildings and Infrastructure Buildings and Infrastructure2 Factors2 Factor - Go to All other pipeline transportation
All other pipeline transportation
Buildings and Infrastructure Buildings and Infrastructure1 Factor1 Factor - Go to Deep well closure (deep well closure - for geothermal power - onshore - 6000m)
Deep well closure (deep well closure - for geothermal power - onshore - 6000m)
Buildings and Infrastructure Buildings and Infrastructure1 Factor1 Factor