Emission Factor
Photovoltaic slanted-roof installation - 3kwp - multi-si - panel - mounted - on roof (market for photovoltaic slanted-roof installation - 3kWp - multi-Si - panel - mounted - on roof)
Interested in licensing this data?
Request a quote→Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an infrastructure representing the installation of a photovoltaic slanted-roof 3kWp multi-Si panel mounted on roof. The infrastructure has a capacity of 3kWp and a lifetime of 30 years. The process includes all the components for the installation of a photovoltaic plant energy use for the mounting and decommission. The cut-off classification is allocatable product. The activity type is market activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Photovoltaic slanted-roof installation - 3kwp - multi-si - panel - mounted - on roof (market for photovoltaic slanted-roof installation - 3kWp - multi-Si - panel - mounted - on roof) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Source Dataset | Cut-off Cumulative LCIA v3.10 |
Region | |
Unit Type | |
Year | 2011 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | unknown |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Activity ID
construction-type_photovoltaic_slanted_roof_installation_3kwp_multi_si_panel_mounted_on_roof_market_for_photovoltaic_slanted_roof_installation_3kwp_multi_si_panel_mounted_on_roof
UUID
67a8a68f-277c-4483-a395-c5d4c6cb6a61
Code Snippet
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Highways / roads / streets / bridges and tunnels
Highways / roads / streets / bridges and tunnels
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor