Emission Factor
Water works - capacity 1.1e10l/year (water works construction - capacity 1.1E10l/year - direct filtration treatment)
Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of water works capacity 1.1E10l/year. The infrastructure represents a medium-sized potable water conventional treatment plant of 30 000m3/day with a lifetime of 60 years. It consists of coagulation and decantation filtration and disinfection. The process includes building materials their decommission and land use. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Water works - capacity 1.1e10l/year (water works construction - capacity 1.1E10l/year - direct filtration treatment) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 2009 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Activity ID
construction-type_water_works_capacity_1.1e10l_per_year_water_works_construction_capacity_1.1e10l_per_year_direct_filtration_treatment
UUID
f3d95aa7-dfc3-4c23-9ea3-4b97c1dda814
Code Snippet
Interested in licensing this data?
Request a quote→Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Geothermal power plant - 5.5mwel (geothermal power plant construction)
Geothermal power plant - 5.5mwel (geothermal power plant construction)
Buildings and Infrastructure Buildings and Infrastructure9 Factors9 Factor - Go to Mine infrastructure - gold (mine construction - gold)
Mine infrastructure - gold (mine construction - gold)
Buildings and Infrastructure Buildings and Infrastructure6 Factors6 Factor