Pipeline - natural gas - high pressure distribution network (pipeline construction - natural gas - high pressure distribution network)
Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction and the installations of a pipeline that is used for natural gas distribution in the high and middle pressure distribution network. It is made of steel polyethylene and cast iron having a total length of 6 380 km. It has a lifetime capacity of 765 000 000 MJ and a lifetime of 40 years. The process includes production of the pipes their transport at the different parts from the factory to the place of installation the excavation for the installation and the decommissioning of the pipeline. Infrastructure of the factory is not included. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Pipeline - natural gas - high pressure distribution network (pipeline construction - natural gas - high pressure distribution network) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 1990 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR5, AR6 |
API Reference
Automate emission calculations with Climatiq
Get started →Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Geothermal power plant - 5.5mwel (geothermal power plant construction)
Geothermal power plant - 5.5mwel (geothermal power plant construction)
Buildings and Infrastructure Buildings and Infrastructure9 Factors9 Factor - Go to Mine infrastructure - gold (mine construction - gold)
Mine infrastructure - gold (mine construction - gold)
Buildings and Infrastructure Buildings and Infrastructure6 Factors6 Factor