Photovoltaics - electric installation for 3kWp module - at building
Interested in licensing this data?
Request a quote→Emission factor summary
The activity generating the emissions is photovoltaics, electric installation for 3kWp module, at building. The Reference Product is photovoltaics, electric installation for 3kWp module, at building. This is an immobile infrastructure, representing the construction of electric installation of a photovoltaic plant, for 3kWp. The infrastructure represents the production of different components and their commissioning for the electric installation of a 3kWp building integrated photovoltaic plant. The electric installation includes all parts between the panel and the grid, but not the inverter as it is modeled in a separate dataset. The process includes materials for the production of the different parts, energy use for metal processing (copper wire drawing) and decommissioning of the installation parts. The Reference Product amount is 1. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. Please refer to the ecoinvent documentation for full details: https://ecoquery.ecoinvent.org/3.12/cutoff/dataset/5465/documentation
| Property | Value |
|---|---|
| Name | Photovoltaics - electric installation for 3kWp module - at building |
| Sector | Buildings and Infrastructure |
| Category | Construction |
| Source | ecoinvent |
| Source Dataset | Cut-off Cumulative LCIA v3.12 |
| Region | |
Unit Type | |
| Year | 1992 |
| Year Released | 2025 |
| Emission Factor |
|
| Scopes | 3.1, 3.2 |
LCA Activity | source_specific |
Supported CO2e Calculation Method | AR5, AR6 |
| Data Versioning |
|
API Reference
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Silicon - electronics grade (market for)
Silicon - electronics grade (market for)
Materials and Manufacturing Materials and Manufacturing1 Factor1 Factor - Go to Industrial machine - heavy - unspecified (market for)
Industrial machine - heavy - unspecified (market for)
Equipment Equipment2 Factors2 Factor - Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Educational and vocational structures
Educational and vocational structures
Buildings and Infrastructure Buildings and Infrastructure321 Factors321 Factor - Go to Health care structures
Health care structures
Buildings and Infrastructure Buildings and Infrastructure321 Factors321 Factor