Emission Factor
Deep well closure (deep well closure - for geothermal power - onshore - 6000m)
Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is delivering the service of closure of a disused deep onshore wells. The infrastructure represent a borehole of 6 000 m depth for geothermal power generation in an unspecific rock formation. A usage duration of 20 years is estimated after which the well is filled with cement and gravel and sealed with a concrete slab. The process includes the materials needed for the closure but excludes the recuperation of the land use. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Deep well closure (deep well closure - for geothermal power - onshore - 6000m) |
Sector | Buildings and Infrastructure |
Category | Infrastructure |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 2008 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR5, AR6 |
API Reference
Activity ID
infrastructure-type_deep_well_closure_deep_well_closure_for_geothermal_power_onshore_6000m
UUID
905ef230-6f06-4c25-8617-08f6ee7fe05b
Code Snippet
Automate emission calculations with Climatiq
Get started →Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Infrastructure Emission Factors
Explore All- Go to Deep well - drilled - for geothermal power (deep well drilling - for deep geothermal power)
Deep well - drilled - for geothermal power (deep well drilling - for deep geothermal power)
Buildings and Infrastructure Buildings and Infrastructure21 Factors21 Factor - Go to Pipeline transport
Pipeline transport
Buildings and Infrastructure Buildings and Infrastructure2 Factors2 Factor - Go to All other pipeline transportation
All other pipeline transportation
Buildings and Infrastructure Buildings and Infrastructure1 Factor1 Factor