Heat and power co-generation unit - organic Rankine cycle - 1400kW thermal - building (market for)
Interested in licensing this data?
Request a quote→Emission factor summary
The activity generating the emissions is market for heat and power co-generation unit, organic Rankine cycle, 1400kW thermal, building. The Reference Product is heat and power co-generation unit, organic Rankine cycle, 1400kW thermal, building. This is an immobile infrastructure, representing the production of a heat and power co-generation unit, organic Rankine cycle, building, with a thermal output of 1,400kW. The infrastructure is automatically supplied with wood chips, using a steam turbine and a multi-cyclone filter, while it has a lifetime of 80 years. The floor area of the power plant building is assumed to be 1600 m2. The process includes building materials, their decommission and land use. The Reference Product amount is 1. The cut-off classification is allocatable product. The activity type is market activity. Please refer to the ecoinvent documentation for full details: https://ecoquery.ecoinvent.org/3.12/cutoff/dataset/9239/documentation
| Property | Value |
|---|---|
| Name | Heat and power co-generation unit - organic Rankine cycle - 1400kW thermal - building (market for) |
| Sector | Buildings and Infrastructure |
| Category | Construction |
| Source | ecoinvent |
| Source Dataset | Cut-off Cumulative LCIA v3.12 |
| Region | |
Unit Type | |
| Year | 2011 |
| Year Released | 2025 |
| Emission Factor |
|
| Scopes | 3.1, 3.2 |
LCA Activity | cradle_to_consumer |
Supported CO2e Calculation Method | AR5, AR6 |
| Data Versioning |
|
API Reference
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Silicon - electronics grade (market for)
Silicon - electronics grade (market for)
Materials and Manufacturing Materials and Manufacturing1 Factor1 Factor - Go to Industrial machine - heavy - unspecified (market for)
Industrial machine - heavy - unspecified (market for)
Equipment Equipment2 Factors2 Factor - Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Educational and vocational structures
Educational and vocational structures
Buildings and Infrastructure Buildings and Infrastructure321 Factors321 Factor - Go to Health care structures
Health care structures
Buildings and Infrastructure Buildings and Infrastructure321 Factors321 Factor