Emission Factor
Deep well closure (market for deep well closure)
Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is delivering the service of closure of a disused deep onshore wells. The infrastructure represent a borehole of 6 000 m depth for geothermal power generation in an unspecific rock formation. A usage duration of 20 years is estimated after which the well is filled with cement and gravel and sealed with a concrete slab. The process includes the materials needed for the closure but excludes the recuperation of the land use. The cut-off classification is allocatable product. The activity type is market activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Deep well closure (market for deep well closure) |
Sector | Buildings and Infrastructure |
Category | Infrastructure |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 2012 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR5, AR6 |
API Reference
Activity ID
infrastructure-type_deep_well_closure_market_for_deep_well_closure
UUID
6dffcb53-a573-4fc0-9e69-5200669b8ff8
Code Snippet
Automate emission calculations with Climatiq
Get started →Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Infrastructure Emission Factors
Explore All- Go to Deep well - drilled - for geothermal power (deep well drilling - for deep geothermal power)
Deep well - drilled - for geothermal power (deep well drilling - for deep geothermal power)
Buildings and Infrastructure Buildings and Infrastructure21 Factors21 Factor - Go to Pipeline transport
Pipeline transport
Buildings and Infrastructure Buildings and Infrastructure2 Factors2 Factor - Go to All other pipeline transportation
All other pipeline transportation
Buildings and Infrastructure Buildings and Infrastructure1 Factor1 Factor