Emission Factor
Pipework for electric heat pump (brine-water geothermal probe) 20kW
1804kgCO2e/number
Interested in licensing this data?
Request a quote→Emission factor summary
Emission intensity of pipework for electric heat pump (brine-water geothermal probe) 20kw. The lifecycle assessment for modules A1-A3 includes: the extraction and processing of raw materials (A1) their transportation to the manufacturer (A2) and the actual manufacturing of the product (A3). Retrieved from the CSV file OEKOBAUDAT 2023-I in the source URL.
Property | Value |
---|---|
Name | Pipework for electric heat pump (brine-water geothermal probe) 20kW |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | OEKOBAUDAT |
Source Dataset | OEKOBAUDAT 2023-I |
Region | |
Unit Type | |
Year | 2018 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | cradle_to_gate |
CO2e Calculation Origin | Source |
CO2e Calculation Method | AR4 |
Supported CO2e Calculation Method | AR4 |
Data Versioning |
|
API Reference
Activity ID
construction-type_pipework_for_electric_heat_pump_brine_water_geothermal_probe_20kw
UUID
64ea3f8e-5154-42f1-af3c-0645e27a02e3
Code Snippet
Automate emission calculations with Climatiq
Related factors
OEKOBAUDAT Emission Factors
Explore All- Go to Wire rod (steel reinforcing bar)
Wire rod (steel reinforcing bar)
Materials and Manufacturing Materials and Manufacturing31 Factors31 Factor - Go to Oriented strand board
Oriented strand board
Agriculture/Hunting/Forestry/Fishing Agriculture/Hunting/Forestry/Fishing24 Factors24 Factor - Go to Geryon security revolving door (aluminium)
Geryon security revolving door (aluminium)
Materials and Manufacturing Materials and Manufacturing20 Factors20 Factor
Construction Emission Factors
Explore All- Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Highways / roads / streets / bridges and tunnels
Highways / roads / streets / bridges and tunnels
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor