Emission Factor

Geothermal power plant - 5.5mwel (geothermal power plant construction)

Emission factor summary

Emissions generated by the activity within the product supply chain as described in ecoinvent v3.8. This is an immobile infrastructure, representing the construction of a geothermal power plant at the surface. The infrastructure represents a coupled underground and surface system with a 5.5MWel power capacity. The process includes all materials necessary to construct it and infrastructure. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.

PropertyValue
NameGeothermal power plant - 5.5mwel (geothermal power plant construction)
SectorBuildings and Infrastructure
CategoryConstruction
Sourceecoinvent
Region
Unit Type
Year
2015
Year Released
2021
Emission Factor
  • CO2e0000kg/number
LCA Activity
Refer to source
Supported CO2e Calculation Method
AR4, AR5

API Reference

Activity ID
construction-type_geothermal_power_plant_5.5mwel_geothermal_power_plant_construction
UUID
4095aedb-62dc-4a75-9505-db0c44e45cb2_e349df37-4d2f-4654-bd54-6c68e03b6197
Code Snippet
View API Docs

Automate emission calculations with Climatiq

Get started

Related factors

ecoinvent Emission Factors

Explore All

Construction Emission Factors

Explore All