Emission Factor
Mine infrastructure - bauxite (market for mine infrastructure - bauxite)
Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of a mine infrastructure bauxite. The mine is used for bauxite mining. It is assumed to have a lifetime of 20 years and a yearly output of 1 000 000 tons. The process include infrastructure and their decommission (buildings with their land use and machines) but it does not include the land use for the mine itself nor that for the roads in the mine. The cut-off classification is allocatable product. The activity type is market activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Mine infrastructure - bauxite (market for mine infrastructure - bauxite) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 2011 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR5, AR6 |
API Reference
Activity ID
construction-type_mine_infrastructure_bauxite_market_for_mine_infrastructure_bauxite
UUID
16919448-68df-4993-a375-a240d2c7405e
Code Snippet
Automate emission calculations with Climatiq
Get started →Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Geothermal power plant - 5.5mwel (geothermal power plant construction)
Geothermal power plant - 5.5mwel (geothermal power plant construction)
Buildings and Infrastructure Buildings and Infrastructure9 Factors9 Factor - Go to Mine infrastructure - gold (mine construction - gold)
Mine infrastructure - gold (mine construction - gold)
Buildings and Infrastructure Buildings and Infrastructure6 Factors6 Factor