Emission Factor
Precious metal refinery (precious metal refinery construction)
Interested in licensing this data?
Request a quote→Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of a precious metal refinery. The infrastructure represents a plant of 5 000 m2 equipped with 1 Electrolyte cell 1 Eluation cell 5 Electrowinning cell 1 Calcination furnace 1 Smelting furnace 1 Electrorefining cell. It has a yearly capacity of anode slime treatment of 243 tons with an assumed lifetime assumed of 25 years. The process includes building materials and their decommission and land use. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Precious metal refinery (precious metal refinery construction) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Source Dataset | Cut-off Cumulative LCIA v3.10 |
Region | |
Unit Type | |
Year | 2000 |
Year Released | 2023 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Activity ID
construction-type_precious_metal_refinery_precious_metal_refinery_construction
UUID
167d6025-dcde-4b7c-915a-4bb1989f8447
Code Snippet
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Highways / roads / streets / bridges and tunnels
Highways / roads / streets / bridges and tunnels
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor