Emission Factor
Solder factory (construction)
Interested in licensing this data?
Request a quote→Emission factor summary
The activity generating the emissions is solder factory construction. The reference product is solder factory. This is an immobile infrastructure, representing the construction of solder factory. The infrastructure has a yearly capacity of 100,000 tons and its life time is assumed to be 50 years. The process includes land use and buildings, but not the equipment. The reference product amount is 1. The cut-off classification is allocatable product. The activity type is ordinary ordinary transforming activity. Please refer to the ecoinvent documentation here for full details: https://ecoquery.ecoinvent.org/3.11/cutoff/dataset/8901/documentation.
Property | Value |
---|---|
Name | Solder factory (construction) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Source Dataset | Cut-off Cumulative LCIA v3.11 |
Region | |
Unit Type | |
Year | 2000 |
Year Released | 2024 |
Emission Factor |
|
LCA Activity | unknown |
Supported CO2e Calculation Method | AR5, AR6 |
Data Versioning |
|
API Reference
Activity ID
construction-type_solder_factory_solder_factory_construction
UUID
0b131950-3b6a-497a-be40-666aee6366b8
Code Snippet
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Communications networks
Communications networks
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Electric power engineering works
Electric power engineering works
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor - Go to Highways / roads / streets / bridges and tunnels
Highways / roads / streets / bridges and tunnels
Buildings and Infrastructure Buildings and Infrastructure78 Factors78 Factor