Emission Factor
Limestone quarry infrastructure (limestone quarry construction)
Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.8. This is an immobile infrastructure, representing the construction of a limestone quarry infrastructure. It has an annual yield of about 380,000 tons. The process includes the land-use of the built part of the mine, the production places and the paved roads. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
Property | Value |
---|---|
Name | Limestone quarry infrastructure (limestone quarry construction) |
Sector | Buildings and Infrastructure |
Category | Construction |
Source | ecoinvent |
Region | |
Unit Type | |
Year | 2000 |
Year Released | 2021 |
Emission Factor |
|
LCA Activity | Refer to source |
Supported CO2e Calculation Method | AR4, AR5 |
API Reference
Activity ID
construction-type_limestone_quarry_infrastructure_limestone_quarry_construction
UUID
9f9d460e-8c1d-4268-b9eb-cb6ad8076196_1e278342-7e3b-426d-b000-58eab8104573
Code Snippet
Automate emission calculations with Climatiq
Get started →Related factors
ecoinvent Emission Factors
Explore All- Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - low voltage (market for electricity - low voltage)
Electricity - low voltage (market for electricity - low voltage)
Energy Energy858 Factors858 Factor - Go to Electricity - medium voltage (market for electricity - medium voltage)
Electricity - medium voltage (market for electricity - medium voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Geothermal power plant - 5.5mwel (geothermal power plant construction)
Geothermal power plant - 5.5mwel (geothermal power plant construction)
Buildings and Infrastructure Buildings and Infrastructure9 Factors9 Factor - Go to Mine infrastructure - gold (mine construction - gold)
Mine infrastructure - gold (mine construction - gold)
Buildings and Infrastructure Buildings and Infrastructure6 Factors6 Factor