Climatiq
Emission Factor

Geothermal power plant - 5.5mwel (geothermal power plant construction)

Interested in licensing this data?

Emission factor summary

Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of a geothermal power plant at the surface. The infrastructure represents a coupled underground and surface system with a 5.5MWel power capacity. The process includes all materials necessary to construct it and infrastructure. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.

PropertyValue
NameGeothermal power plant - 5.5mwel (geothermal power plant construction)
SectorBuildings and Infrastructure
CategoryConstruction
Sourceecoinvent
Source DatasetCut-off Cumulative LCIA v3.10
Region
Unit Type
Year
2015
Year Released
2023
Emission Factor
  • CO2e
    kg/number
Scopes3.1, 3.2
LCA Activity
Refer to source
Supported CO2e Calculation Method
AR5, AR6
Data Versioning
  • Status: Replaced
  • Replaced in: 20Version log
  • Replaced by: 5b4ad05b-179e-4c52-894e-aaee7457c1e9

API Reference

Activity ID
construction-type_geothermal_power_plant_5.5mwel_geothermal_power_plant_construction
UUID
479f53d6-6c42-41cc-9e90-1ccfef07f98e
Code Snippet
View API Docs

Automate emission calculations with Climatiq

Related factors

ecoinvent Emission Factors

Explore All

Construction Emission Factors

Explore All