Emission Factor

Geothermal power plant - 5.5mwel (geothermal power plant construction)

Interested in licensing this data?

Request a quote

Emission factor summary

Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of a geothermal power plant at the surface. The infrastructure represents a coupled underground and surface system with a 5.5MWel power capacity. The process includes all materials necessary to construct it and infrastructure. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.

PropertyValue
NameGeothermal power plant - 5.5mwel (geothermal power plant construction)
SectorBuildings and Infrastructure
CategoryConstruction
Sourceecoinvent
Region
Unit Type
Year
2015
Year Released
2023
Emission Factor
  • CO2e0000kg/number
LCA Activity
Refer to source
Supported CO2e Calculation Method
AR5, AR6
Data Versioning
  • Status: Current

API Reference

Activity ID
construction-type_geothermal_power_plant_5.5mwel_geothermal_power_plant_construction
UUID
479f53d6-6c42-41cc-9e90-1ccfef07f98e
Code Snippet
View API Docs

Automate emission calculations with Climatiq

Related factors

ecoinvent Emission Factors

Explore All

Construction Emission Factors

Explore All