Emission Factor

Hard coal power plant (construction - 100MW)

Interested in licensing this data?

Request a quote

Emission factor summary

The activity generating the emissions is hard coal power plant construction, 100MW. The Reference Product is hard coal power plant. This is an immobile infrastructure, representing the construction of a hard coal power plant. The infrastructure represents a plant with a total of 150,000 full load hours. In ecoinvent, one power plant each with 100 MW and 500 MW is accounted for lignite and hard coal. The dataset represents a mix with a share of 30 % and 70 %, respectively. The smaller power plants are equipped with electrostatic precipitators (ESP) and flue gas desulfurization plants (FGD), while an additional DeNOx plant was considered for the large power plants. This corresponds to lifetimes of 33 and 38 years, respectively. The area required is 2050 m2/MW. In addition, a construction period of 2 years is assumed. It includes all the materials necessary for the construction, the construction efforts, land use and decommission. The Reference Product amount is 1. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. Please refer to the ecoinvent documentation for full details: https://ecoquery.ecoinvent.org/3.12/cutoff/dataset/6161/documentation

PropertyValue
NameHard coal power plant (construction - 100MW)
SectorBuildings and Infrastructure
CategoryConstruction
Sourceecoinvent
Source DatasetCut-off Cumulative LCIA v3.12
Region
Unit Type
Year
1980
Year Released
2025
Emission Factor
  • CO2e
    kg/number
Scopes3.1, 3.2
LCA Activity
source_specific
Supported CO2e Calculation Method
AR5, AR6
Data Versioning
  • Status: Current

API Reference

Activity ID
construction-type_hard_coal_power_plant_hard_coal_power_plant_construction_100mw
UUID
0b1b8ce0-30d2-47dc-ae24-c7ce17184d04
Code Snippet
View API Docs