Emission Factor
Wind turbine network connection - 2mw - onshore (wind turbine network connection construction - 2MW - onshore)
Interested in licensing this data?
Emission factor summary
Emissions generated by the activity within the product supply chain as described in ecoinvent v3.10. This is an immobile infrastructure representing the construction of a wind turbine network connection 2MW onshore. The infrastructure represents a network connection for wind turbines with 2MW using a 10 kV-cables with a total length of 1 000 m per turbine. It has a lifetime of 20 years. The process includes all main materials for the construcion their decommission and land use but it excludes energy use for assembly. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. The reference product amount is 1.
| Property | Value |
|---|---|
| Name | Wind turbine network connection - 2mw - onshore (wind turbine network connection construction - 2MW - onshore) |
| Sector | Buildings and Infrastructure |
| Category | Construction |
| Source | ecoinvent |
| Source Dataset | Cut-off Cumulative LCIA v3.10 |
| Region | |
Unit Type | |
| Year | 2008 |
| Year Released | 2023 |
| Emission Factor |
|
| Scopes | 3.1, 3.2 |
LCA Activity | unknown |
Supported CO2e Calculation Method | AR5, AR6 |
| Data Versioning |
|
API Reference
Activity ID
construction-type_wind_turbine_network_connot_specifiction_2mw_onshore_wind_turbine_network_connot_specifiction_construction_2mw_onshore
UUID
64f5ad8c-299c-4417-a03e-e7534d511ae2
Code Snippet
Automate emission calculations with Climatiq
Related factors
ecoinvent Emission Factors
Explore All- Go to Silicon - electronics grade (market for)
Silicon - electronics grade (market for)
Materials and Manufacturing Materials and Manufacturing1 Factor1 Factor - Go to Industrial machine - heavy - unspecified (market for)
Industrial machine - heavy - unspecified (market for)
Equipment Equipment2 Factors2 Factor - Go to Electricity - high voltage (market for electricity - high voltage)
Electricity - high voltage (market for electricity - high voltage)
Energy Energy858 Factors858 Factor
Construction Emission Factors
Explore All- Go to Construction work
Construction work
Buildings and Infrastructure Buildings and Infrastructure49 Factors49 Factor - Go to Educational and vocational structures
Educational and vocational structures
Buildings and Infrastructure Buildings and Infrastructure321 Factors321 Factor - Go to Health care structures
Health care structures
Buildings and Infrastructure Buildings and Infrastructure321 Factors321 Factor