Emission Factor

Geothermal power plant - 5.5MWel (geothermal power plant construction)

Interested in licensing this data?

Request a quote

Emission factor summary

The activity generating the emissions is geothermal power plant construction. The Reference Product is geothermal power plant, 5.5MWel. This is an immobile infrastructure, representing the construction of a geothermal power plant at the surface. The infrastructure represents a coupled underground and surface system with a 5.5MWel power capacity. The process includes all materials necessary to construct it and infrastructure. The Reference Product amount is 1. The cut-off classification is allocatable product. The activity type is ordinary transforming activity. Please refer to the ecoinvent documentation for full details: https://ecoquery.ecoinvent.org/3.12/cutoff/dataset/14158/documentation

PropertyValue
NameGeothermal power plant - 5.5MWel (geothermal power plant construction)
SectorBuildings and Infrastructure
CategoryConstruction
Sourceecoinvent
Source DatasetCut-off Cumulative LCIA v3.12
Region
Unit Type
Year
2015
Year Released
2025
Emission Factor
  • CO2e
    kg/number
Scopes3.1, 3.2
LCA Activity
source_specific
Supported CO2e Calculation Method
AR5, AR6
Data Versioning
  • Status: Current

API Reference

Activity ID
construction-type_geothermal_power_plant_5.5mwel_geothermal_power_plant_construction
UUID
221d69c7-dd7e-4747-b048-d23a882bbbc8
Code Snippet
View API Docs

Related factors

ecoinvent Emission Factors

Explore All

Construction Emission Factors

Explore All